December 2019

Preparing for the initial engine fit I begin marking out the rear firewall for the cooling and fuel system as per the factory diagrams.


Rear Bulkhead Prepare    Rear Bulkhead Prepare  

 

I need to drill holes for the cooling swirlpot and expansion tanks and brackets.
I first drill the brackets and then clamp the tanks to the brackets to mark the holes.

Rear Bulkhead Prepare    Rear Bulkhead Prepare    Rear Bulkhead Prepare   

Rear Bulkhead PrepareRear Bulkhead Prepare        Rear Bulkhead Prepare   

Rear Bulkhead Prepare        Rear Bulkhead Prepare   Rear Bulkhead Prepare         

Rear Bulkhead Prepare        Rear Bulkhead Prepare   


These Cleko grip clamps have an amazing grip .

Rear Bulkhead Prepare    Rear Bulkhead Prepare

 

I also need to prepare the bracket to mount the Aircon Drier

Rear Bulkhead Prepare    Rear Bulkhead Prepare  

 

The Header and expansion tanks have gone a bit dull whilst in storage and I give them a polish with Solvol Autosol, some of the small marks created in storage are sanded
out with progressively finer grades of wet and dry before polishing, they come up pretty good.

Rear Bulkhead Prepare    Rear Bulkhead Prepare    Rear Bulkhead Prepare